TPWD 1966 F-3-R-13 #1031: Job Completion Report: Evaluation of Copper Sulphate as a Fish Toxicant, Fisheries Investigations and Surveys of the Waters of Region 3-8
Open PDFExtracted Text
JOB COMPLETION REPORT
As required by
FEDERAL AID IN FISHERIES RESTORATION ACT
TEXAS
Federal Aid Project F-S—R—lS
FiSheries Investigations and Surveys of the Waters of Region 3—8
Job No. E-l Evaluation of Copper Sulphate
Project Leader: Joe Eb Toole
Jo Rb Singleton
Executive Director
Texas Parks and Wildlife Department
Austin? Texas
Marion Toole Eugene A; Walker
D-J Coordinator Director, Wildlife Services
October 17, 1966
ABSTRACT
Fisheries surveys were made on two private lakes in Region S-B that
were previously treated with copper sulphate for control of bullhead cat-
fish.
Soutter*s Lake} near Athens, now has a much lower bullhead population
than it had prior to the 1961 treatment with copper sulphate. An increase
in the largemouth bass population of this lake has served as a natural
predation factor against bullhead overpopulation since the treatment.
Wheeler's Lake, near MarshallF was also re-surveyed this segment.
This lake was treated with copper sulphate in 1958 as the first attempt
to control bullhead catfish with this chemical. Only six bullheads were
netted from the lake this segment but a valid conclusion of the original
treatment effectiveness cannot be made due to the lake being drained since
treatment,
It is recommended that this job be terminated due to the difficulty
of obtaining suitable lakes for re-survey. Most of the previously treated
waters have been subjected to additional fish control treatmants since
the original copper sulphate treatment. Surveys of these lakes will not
provide conclusive data for evaluation.
JOB COMPLETION REPORT
State of Texas
Project No. F-B—R—IS Name: Fisheries Investigations and Surveys
of the Waters of Region S-B
Job No. Eul Title: Evaluation of Copper Sulphate as a
Fish Toxicant.
Period Covered: February 1 1965 — January 51,1966
OBJECTIVES:
To further evaluate copper sulphate as a fish toxicant.
TECHNIQUES USED:
Fisheries surveys were made on small private lakes in Region 3-8 that
were previously treated with copper sulphate for selective control of bulls
head catfish (Ictalurus sp.). Data from the original treatment surveys were
compared to that collected during this segments surveys to determine if ex-
tended control of these fish was achieved. Standardized experimental gill
nets were used for collection purposes. These nets are 150 feet in length,
8 feet in depth with mesh size ranging from 1 to 5% inches.
FINDINGS:
Soutter' s lake located 15 miles southeast of Athens was treated June 14,
1961 with 800 pounds of copper sulphate for control of bullhead catfish. Table
1 contains netting data collected immediately before this treatment. Table 2
contains netting data collected on June 20, six days after the treatment. Table
5 contains the netting data collected during the 1965 re—survey.
By compari.son of the netting data compiled before and after treatment,
it is obvious that a good selective kill of bullhead catfish was obtained.
It is interesting to note the greatly increased catch of sunfish after the
treatment due to the accelerated rate of activity caused by the chemical.
A comparison of the data contained in Tables 2 and 5 indicates that
after a four year period, the bullhead catfish populations in Soutter's Lake
are still well below the 1961 pre-treatment populations. Part of this success
is attributed to the increased population o:f largemouth bass (Micropterus
salmoides) in the lake. The bass have no doubt provided good predatory control
over the bullheads. Ten bass averaging almost three pounds in weight were
netted in the re-survey. Only four small bass were netted prior to the treat-
ment in 1961.
In conclusion of the above data? it is evident that the treatment with
copper sulphate on this lake was successful. Over 6,000 dead bullhead cat-
fish were counted after the treatment.
-2-
Table 1
Netting data from Soutter's lake June 12, 1961 before treatment
Species Number “ Weight
Largemouth bass I 4 4.62
Yellow bullhead 22 7.94
Black bullhead 18 5.69
Black crappie 6 1.06
Golden shiner 1 .25
Bluegill sunfish __46 4.15
79? 21.69
Table 2
Netting data from Soutter‘s Lake June 14, 1961 after treatment
Species Number Weight
Bluegill Sunfish 159 15.50
Black crappie 6 .82
Warmouth (Goggle—eye) 5 .62
Green sunfish ___1_ .25
169 15.19
Table 5
Netting data for Soutter‘s Lake rensurvey, July 27, 1965
Species Number Weight
Largemouth bass 10 28.88
Yellow bullhead . ' 8 6.00
Chubsucker 2 1.50
Bluegill sunfish 54 6.00
Warmouth 15
__1. _____:_..._.
55 42.51
-3-
WHEELER ' S LAKE
Wheeler's lake, located three miles southwest of Marshall, was treated
with copper_su1phate on September 25, 1958. This was the first attempt to
control bullhead catfish with this chemical in Region 5—8. Complete netting
records are not available before or after treatment although many dgad bull-
heads were noted after the treatment.
Three units of experimental gill net were set overnight on September 15,
1965 in Wheeler's Lake. A total of six bullhead catfish were netted. An
accurate conclusion of the original treatment of this lake cannot be made
due to a partial draining of the lake during enlargement operations. The
present bullhead population however is well below normal for comparative
area 1akes.‘t
CONCLUSIONS AND RECOMMENDATIONS:
The Soutter lake selective kill was successful in controlling the bull-
head catfish population in 1961. This treatment provided a more balanced
ratio of game and rough fish species. Effective predation by the game fish
has maintained this improved ratio.
Several additional lakes previously treated with copper sulphate were
chosen to be re-surveyed during this segment. Due to various reasons, they
were found to be either unavailable or non-suitable due to major environmental
changes since treatment. Data from these lakes would not provide valid evalua—
tional figures to determine the true value of the copper sulphate treatments.
For these reasons, it is recommended that this job be terminated with the
completion of this segment.
Prepared by Joe E. Toole Approved 2%: W /M&
Project Leader : Coordinator
Date October 17, 1966 Charles E. Gray
Regional Supervisor