TPWD 1966 F-4-R-13 #1096: Job Completion Report: Evaluation of Walleye Fry Stocked in Possum Kingdom Lake, Project F-4-R-13
Open PDFExtracted Text
--- Page 1 ---
JOB COMPLETION REPORT
Josie ope
FILE
As required by
FEDERAL AID IN FISHERIES RESTORATION ACT
TEXAS
Federal Aid Project No, F-4-R-13
Fisheries Investigations and Surveys of the Waters of
Region 2-A
Job No, B-35: Evaluation of Walleye Fry Stocked in
Possum Kingdom Lake
Project Leader: Dwane Q. Smith
J. R. Singleton
Executive Director
Texas Parks and Wildlife Department
Austin. Texas
Marion Toole Eugene A, Walker
D-J Coordinator Director. Wildlife Services
February 20, 1967
--- Page 2 ---
ABSTRACT
The total stockings for 1964 and 1965 exceeded. 600,000 walleye fry for Possum
Kingdom Lake. In order to evaluate the walleye stocking an effort was made to
recover some of the fish. Gill nets were used and set at various sites, Only one
walleye was recovered by this method, The fish weighed 412 grams. Various reports
of walleye catches were reported by fishermen, and one walleye (936 grams) was
caught by a contract netter.
With only a few returns there seems to be survival and growth of the walleye
but to date no reproduction has been noted.
Further evaluation ig being conducted (Job B-35, F-4-R-14),
--- Page 3 ---
JOB COMPLETION REPORT
State of ss Texas
Project No.___F4-R-i3 Name: Region 2-A Fisheries Study
Job No. B-35 Title: Evaluation of Walleye Fry Stocked in
Possum Kingdom Lake
Period Covered: _
Objective:
Possum Kingdom Lake.
oO
hh
+
=y
@m
R
oO
Py
m
=)
=.
=
oy
io
_
D
Ke
an
u
ei
G
oO
an
a
Bu
we
fa
rs}
To evaluate the resvits
Techniques Used:
The originai stocking of walleye fry (Stizostedion Possum Kingdom
Lake was made in May 1964, with a total cf 195,000 fry. 1965, a total of
500,000 walleye fry was flown to Possum Kingdom from lowa. i ings the two-year
total to 605,000 fry.
Findings:
Gill nets were set in hopes of catching some of the larger fish to determine
their growth and validate theiz survival. Seines were used in attempting to catch
some of the released fry, therefore, determining if there had been a spawn from the
two-year-old fish.
Bi-monthly water samples were taken and anaiyzed for dissolved oxygen, dissolved
carbon dioxide, sodium chloride and pH.
A total of 4.350 feet of gill net was used te take i8 species of fish (Tabie
1}. Net stations were located from the Cartes {1 aves : the dam,
Only one walieye was taken by gil! nets ‘weight 412 grams, a@ithcugh aumerou
walleye were caught by fishermen and returned to the lake ‘there is mo open season
on walieye}. Another walleye, caught by a contract netter. we iven to project
personnel. This fish weighea two pounds amd one ounce. No wa ye were caught by
the use or seines.
163]
ia}
reed
No fry were stocked in Possum Kingdom Lake during this segment of work. With
the one caught by Department netting, the one caught by a contract netter and various
others caught by fishermen, there seems to be some growth and survival of walleye
in the lake.
Chemical analysis was run for oxygea, carbon dioxide, pH and sodium chloride.
The high chloride posed more concern than cther chemicals High chloride has long
been a problem on the Brazos Fiver; as @ result, Possum Kingdom is high in chlorides.
--- Page 4 ---
wile
Table No, 1, Netting results from Possum Kingdom Lake. Evaluation of Walleye
Stocking in Possum Kingdom Lake. November 1965 ~ October 1966, (F~4-R-13),
OL LO LL LE LC A LEA eG er
PER CENT TOTAL PER CENT
TOTAL OF LBS. OF
SPECIES NUMBER NUMBER WEIGHT WEIGHT
Spotted gar 2 0,87 4,61 1.53
Longnose gar 10 4.37 18.58 6,19
Gizzard shad 60 26.19 33.23 11.06
Smallmouth buffalo 18 7,86 115.44 38.45
Carp 10 4.37 32.76 10,91
Carpsucker 6 2.62 13,92 4,63
Channel catfish 15 6.55 23.58 7.85
Flathead catfish 1 0,44 5.99 2.00
White bass 29 12.66 10,20 6.39
Ky. spotted bass 4 1,75 2,53 0.84
Largemouth bass 17 7.42 16.17 5.39
Green sunfish 1 0.44 0,28 0.09
Redear sunfish 9 3.93 2.43 0.81
Bluegill sunfish 33 14.41 6.99 Zaao
Longear sunfish 3 1.31 0,91 0,30
White crappie 4 1.75 1.96 0.36
Walleye perch 1 0.44 0.90 0,30
Freshwater drum 6 2,62 1,71 0.57
en
TOTALS 229 100,00 291.29 100.00
--- Page 5 ---
a3
Fal-R-13 Job B35 Possum Kingdom Walleye Evaluation. Nov.1965 = Oct.1966
x Raleose Sites ~ Recovery Sife, /-20 Met Stateons
--- Page 6 ---
Prepared by Dwane Q. Smith Approved by LL.
Date_
HIGH LOW
Dissolved Oxygen (ppm) 8.5 8,0
Carbon Dioxide (ppm) 5.0 0.0
Sodium Chloride (ppm) 1520.0 350.0
pH 8.5 8.0
Project Leader
February 20, 1967 0
PO) em os
a a é
JY wa
Coordinator
___FRED_G. LOWMAN
Regional Supervisor