TNHCi_5063
Not suspect, not examinedPhotos
No photos available.
Map
Location
29.84376° N, 99.65942° W
(± 2266.0
m)
Taxonomy
GenusGambusia
Speciesaffinis
Specimen
Num Specimens4
Collection Event
CollectorMcCoy
Collected Date1955.8.15
Geography
DrainageNueces
CountryUnited States
StateTexas
CountyReal
LocalityHEB Foundation Camp, 10 mi. NE Leakey, State Hwy 83, lower dam
Record Source
Source
Texas Natural History Collections
(type: specimens)
Institution
Texas Natural History Collections
(type: museum)
Curator
Dean Hendrickson
Record Added
May 13, 2010
Record Last Modified
March 23, 2026
Data Processing Track
Track 2
From Data Set Received
04/2009 to 10/2010
Identification
Suspect Notes
None
Count
4
Current Determination
Determiner
Fishes of Texas staff
Determination Date
Unknown
Determination Type
Unspecified
Identification Comments
None
Identification Confidence
Unknown
Collecting Event
Collected
Aug. 16, 1955
Collector(s)
Collecting Event ID
10058
Field Notes
There are no field notes available.
Locality
Region
Edwards Plateau
Jurisdiction
Real, Texas
Name
East Frio River, most downstream dam in area of 10 miles northeast of Leakey via SH 83
Hydrography
Texas-Gulf Region
Nueces-Southwestern Texas Coastal
Nueces
Upper Frio
West Frio River
Upper East Frio River
Captive
no
Locality Photos
No locality photos available.
flag (suspect/examine)
suspect: noexamination: no
date
date_range: 8/16/1955-8/16/1955
collectors
collectors: McCoy
collectors
collectors: McCoy
date
date_range: 8/15/1955-8/15/1955
staff comment
ID Status: Not flagged for specimen examination. By default we accept donor specimen determinations (after synonymization to our taxonomy). If georeferenced to TX this record has been considered in spatial context with other occurences of this species and accepted as correct.
ID Comments: NAGeoref Remark: Unsure of extent of HEB Foundation Camp so point is placed at most downstream dam in area and extent covers the most upstream dam.
georeference
Error: 2265.95635199028
Remarks: Unsure of extent of HEB Foundation Camp so point is placed at most downstream dam in area and extent covers the most upstream dam.
Locality: East Frio River, most downstream dam in area of 10 miles northeast of Leakey via SH 83
Coordinates: 29.843758453;-99.659417153Georeferencer: GLMGeographic note: Inland USA TexasUnsure of extent of HEB Foundation Camp so point is placed at most downstream dam in area and extent covers the most upstream dam.
Comments On TNHCi_5063